Monthly Archives: January 2012

ETA Boiler Arrives

  Concrete pad down, boiler lifted into place by forklift and final adjustment made with a crowbar to inch it into position. This two tonne lump of Austrian engineering should be ready to provide heat for the next crop of … Continue reading

Posted in Case Study - Savage Cat Farm | Tagged | Comments Off