Tag Archives: Commercial Biomass

More chips with that, Sir?

A short film showing Nigel Dunn at work. He chipped six month’s worth of fuel for Savage Cat Farm in the course of a day. By the time he left the barn was bulging. This chipper is an amazing piece … Continue reading

Posted in Case Study - Savage Cat Farm | Tagged , , , , , | Comments Off

Pair of skids

Shame to cover up the pipework with insulation, but it has to be done. These two are off to the Cotswolds to be fitted at the end of this week. Then the workshop will be geared-up for four more that … Continue reading

Posted in Case Study - Cotswold Estate | Tagged , , , , , | Comments Off

Eta Pe-K Wood Pellet Boiler

Where handling bulky wood chip is a problem, the pellet boiler is the perfect choice. We installed this Eta Pe-K in a disused stable block and located the pellet store in the neighbouring stall. The control touchscreen is very similar … Continue reading

Posted in Case Study - Mill Court | Tagged , , , , , , , | Comments Off

RHI Raised

Perhaps unbelievably, the government has raised the RHI from 1st April 2012, so it’s even more of a no-brainer for businesses that use a lot of heat to switch over to using biomass boilers. The rate has gone from £79/Mw to … Continue reading

Posted in Uncategorized | Tagged , , | Comments Off